Sustainable Energy Design

60 MW Glanmire Solar Farm :66 kV Overhead line Designs

SED is working with the developer to complete all the Level3 ASP network designs for this complex project. The project involves around 8 km of new 66 kV line along with other 11 kV line upgrades to meet Essential Energy planning requirements.

SED scope

Inverter Installation, HV installations, Earthing Installations, Comm’s and SCADA installation, wiring and commissioning.

Junee Solar Farm-Junee Prime Lamb

Junee prime lamb was looking to offset their 2 MVA site load.The solution was an under 5 MW Chapter 5 A Solar Farm within their property connected to the same HV meter on their premise.The Plant was commissioned initially as zero export later transitioning to export mode.The plant can export excess energy to the grid after covering all their loads.The plant is connected to Junee 66/11kV Zone sub of Essential Energy.The plant uses Sungrow SG 3400 inverter with Sungrow PPC.DC coupled batteries are also approved. Noja GMK is employed as HV switchgear.

SED scope

Inverter Installation, HV installations, Earthing Installations, Comm’s and SCADA installation, wiring and commissioning.

Sundown Pastoral Solar Farm-Wathagar Cotton Gin

Sundown pastoral Co Pty Ltd was looking to offset their 2 MVA site load of their existing Wathagar Cotton Gin.The solution was a 4.95 MW Chapter 5 A Solar Farm within their property connected to the same HV meter on their premise.The plant can export excess energy to the grid after covering all their loads.The plant also employs DC coupled batteries to cover peak loads when solar is not available. The plant is connected to Wathagar 66/11kV Zone sub of Essential Energy.The plant uses Sungrow SG 4950 inverter with Inaccess PPC. Noja GMK’s are employed as HV switchgears.

SED scope

Midkin Solar Farm-Cotton Gin,Ashley

AFF Land Pty Ltd was looking to offset their 2.5 MVA site load of their existing cotton gin in Ashley, NSW near Moree. The solution was a 4.99 MW Chapter 5 A Solar Farm within their property connected to the same HV meter on their premise.The existing site has multiple Essential Energy owned lines and substations with multiple HV connection points and HV metering .SED proposed,negotiated and got acceptance with Essential Energy for a single point of connection and HV metering with internal modifications /extensions to the site HV network .The plant can export excess energy to the grid after covering all their loads.The plant is connected to Ashley 66/11kV Zone sub of Essential Energy.The studies were completed with 2x SC2750 SMA inverters and SMA Hycon controller as PPC.

SED scope

HV Upgrades and operation maintenance for Orange Base and Bloomfield Hospitals

SED is engaged to perform the HV operation switching and HV maintenance for Orange Base and Bloomfield Hospitals in Orange ,NSW.We have performed numerous HV and LV upgrades on the ageing HV and LV network .

SED scope

22 km of 132 kV Overhead line design for Cadia Valley mines

Cadia Valley mines engaged SED to perform overhead line designs for 22 km of their new twin circuit 132 kV overhead line.

SED scope

Inverter Installation, HV installations, Earthing Installations, Comm’s and SCADA installation, wiring and commissioning.

Somerset Solar Farm-Tamworth

Somerset Solar Farm is a 4.99 MW chapter 5A solar farm with proposed internal industrial( subdivision) load of 3.2 MVA under the same HV meter. The project location is Tamworth and the plant is connected to Goddard Lane 66/11 kV zone sub of Essential Energy. The studies were completed with 2x SC2800 SMA inverters and SMA Hycon controller as PPC.

SED scope

Negotiation and Grid connection documentation with Essential Energy.

Thunderbolt Solar Farm-Uralla

Thunderbolt Solar Farm is a 4.95 MW chapter 5A solar farm. The plant is connected to Uralla 66/11 kV zone sub of Essential Energy. SED negotiated and proposed alternatives to the recommended network augmentation by Essential Energy to minize network upgrade costs to the client. SED optimised the plant capacity ,operational mode, and configurations etc to acheive this. The studies were completed with Sungrow SG 4950 inverter and Inaccess PPC.DC coupled batteries were also included.

SED scope

Bathurst Hospital Upgrades

SED completed numerous works at Bathurst hospital.

SED scope

Forbes Solar Farm-Forbes

Forbes Solar Farm is a 4.5 MW chapter 5A solar farm. The plant is connected to Forbes 66/11 kV zone sub of Essential Energy. The studies were completed with 2 x SMA SC2660 Inverter and SMA Hycon PPC.

SED scope

Blayney Solar Farm-Blayney

Blayney Solar Farm is a 4.95 MW chapter 5A solar farm. The plant is connected to Blayney 66/11 kV zone sub of Essential Energy. The studies were completed with Sungrow SG4950 Inverter and Inaccess PPC.DC coupled batteries were also included.

SED scope

Eugowra Solar Farm-Cabonne Shire Council

Cabonne Shire Council was looking at a Solar farm proposal in Eugowra ,NSW. Eugowra Solar Farm is a 3 MW chapter 5A solar farm. The plant is connected to Payten’s Bridge 66/11 kV zone sub of Essential Energy. The studies were completed with Sungrow SG3400 Inverter and Inaccess PPC.DC coupled batteries were also included.

SED scope

Byron Bay Solar Farm-Byron Bay

Byron Bay Solar Farm is a 4.95 MW chapter 5A solar farm. The plant is connected to Ewingsdale 132/11kV zone sub of Essential Energy. The studies were completed with Sungrow SG4950 Inverter .The project was aborted midway during network studies stage due to community objection. SED completed the Steady state studies for the project.

SED scope

Chillamura Solar Farm-Bogabbilla

SED was engaged to complete the Level 3 ASP designs for their Chillamurra Solar Farm located in Bogabbilla.

SED scope

Biodigester at Cowra Abbattoir

SED was engaged by Break out river meats to complete numerous internal works including a Bio digester.

SED scope

Biodigester/PV Hybrid Generation at West Pork

SED was engaged to design and install a complex hybrid generation system consisting of a Bio digester , Grid Forming Solar PV Inverters and Diesel Generators

SED scope

HV works-CSA Mine Cobar

SED was engaged to complete numerous HV designs, Installations and Testing Commissioning.

SED scope

HV works- Hanson Quarry East Guyong

SED was engaged to complete the Level 3 ASP designs, HV operation,Maintenance and other testing/commissioning for Hanson Quarry at East Guyong.

SED scope

Kanowna Solar Farm-Moree

SED was engaged to complete the Level 3 ASP designs for Kanowna Solar Farm located near Moree.

SED scope

Overhead line designs for Woodlawn zinc copper Project-Goulburn

SED was engaged to complete the overhead line designs for Woodlawn zinc copper project in Goulburn

SED scope

Orange City Council Projects

SED has completed numerous Orange city council projects

SED scope

Parkes Shire Council Projects

SED has completed numerous Parkes Shire council projects

SED scope

Bathurst City Council Projects

SED has completed numerous Bathurst city council projects

SED scope

Cowra Shire Council Projects

SED has completed numerous Cowra Shire council projects

SED scope

Latitude Solar Farm-Bogabbilla

SED was engaged to complete the Level 3 ASP designs for their Latitude Solar Farm located in Bogabbilla..

SED scope

Cowra Microgrid

SED was engaged to complete the Industrial Microgrid project in Cowra NSW.

SED scope

Parkes Petcare Kitchen-500 kW Solar

SED was engaged to complete the Grid Connection of 500kW solar PV located within their factory premises in Parkes ,NSW. The plant is now configured as a Zero export system. .SED works closely with their consultants Delta Q Pty Ltd.

SED scope

Parkes Petcare Kitchen-4.99 MW Solar Farm

SED was engaged to perform the DC designs for their proposed 4.95 MW Solar Farm located within their factory premises in Parkes ,NSW.

SED scope

Bathurst Correctional Centre HV Upgrades

SED was engaged to perform Level 3 ASP designs, HV switching operation, commissioning and initial energisation of the upgraded section of Bathurst correctional centre.

SED scope

NSW Public works department Projects

SED was engaged to perform Level 3 ASP designs, and DC designs for various projects by NSW public works department

SED scope